Terms and Conditions
Definitions
Estimate: Estimate issued by the Contractor to the Customer containing the Contractor's company details, description of the work and the associated assumptions, clarifications and exclusions
Agreement: This contract as provided to the Customer by the Contractor and comprising the Estimate and these Terms and Conditions.
Commencement Date: The date proposed by the Contractor to start the works.
Contractor: Network Delivery Associates Limited whose registered office is Castle Court, 41 London Road, Reigate, England, RH2 9RJ, or any entity who carries out the Works on the Contractor's behalf.
Customer: Persons and/or company identified on the Estimate or any entity including any person or company who appears to act with the Customer's authority.
Completion Date: The estimated date for completion of the Works as outlined in writing by the Contractor to the Client
Estimate: Identifies the Works, the Price for completing the Works, payment methods and any particular items that are to be included/excluded in the Price.
Intellectual Property Rights: Intellectual Property Rights: patents, utility models, rights to inventions, copyright and related rights, moral rights, trademarks and service marks, business names and domain names, rights in get-up, goodwill and the rights to sue for passing off rights in designs, rights in computer software, database rights, rights to use, and protect the confidentiality of, confidential information (including know-how and trade secrets), and all other intellectual property rights, in each case whether registered or unregistered and including all applications and rights to apply for and be granted, renewals or extensions of, and rights to claim priority from, such rights and all similar or equivalent rights or forms of protection which subsist or will subsist now or in the future in any part of the world.
Normal Working Hours: 08:30 – 16:30 Monday to Friday inclusive whereby the commercial banks are open for business in the City of London (excluding Bank or Public Holidays).
Price: The price payable by the Customer as detailed in the Estimate (or as otherwise varied by the Contractor pursuant to these Terms and Conditions)
Site: The location of the Works.
Works: The services which are to be performed by the Contractor for the Customer as identified in the Estimate. The Works shall exclude all items in Schedule 1 attached hereto unless expressly set out in the Estimate as being included in the Works and the Price.
The Agreement
It is hereby agreed that the Customer appoints the Contractor to provide the Works. The Contractor will use reasonable skill and care in completing the Works.
This Agreement commences on receipt by the Contractor of a written instruction to proceed with the Works. Upon commencement of the Works by the Contractor, the Customer shall be deemed to have accepted the Agreement inclusive of the Price, the Estimate and these Terms and Conditions
The estimate has been calculated on the basis of the information provided by the Customer to the Contractor. If the Customer's requirements or specifications change in any way the changes will not be covered by the Estimate and the Customer must pay in full any additional costs incurred. The Contractor will not be liable for any associated delays
The Estimate is valid for 30 days unless otherwise specified in the Estimate. Should the Customer wish to accept the Estimate after this period has expired the Contractor may provide a revised Estimate for the Works.
This Agreement shall take precedence over any previous or subsequent purchase orders, order forms or correspondence to the contrary and shall apply to the exclusion of any other terms that the Customer seeks to impose or incorporate, or which are implied by trade, custom, practice or course of dealing. For the avoidance of doubt, the Contractor does not accept conditions which may be contained in the Customer's own order forms or other documents and which are not consistent with the terms and conditions contained within the Estimate or Terms and Conditions.
1. Obligations – Contractor
1.1. The Contractor is to provide the Works within Normal Working Hours using reasonable endeavours to complete the works to any specified Customer programme.
1.2. The Contractor having commenced the Works, will use reasonable endeavours to complete the Works without undue delay unless delayed or prevented from doing so by events or circumstances beyond its control when it will be entitled as appropriate to either reasonable additional costs and time to complete the Works or to terminate the Agreement.
1.3. For the avoidance of doubt the Contractor has no liability under this Agreement if it is prevented or delayed from carrying out the Works by acts, events, omissions, or accidents beyond its reasonable control, including strikes, floods, fire and any act of God.
1.4. The Contractor reserves the right to implement alternative engineering solutions/practices where it is deemed the inclusions, exclusions and assumptions of this Agreement or associated Estimate are found at any time to be to the detriment of the commercial, engineering and safety practices of the Contractor. Additional costs incurred will be fully chargeable to the Customer. The Contractor shall be at liberty to refuse to undertake any variation or variations which either alone or taken together alter the Works to be carried out pursuant to this Agreement.
2. Obligations – Customer
2.1. The Customer shall provide accurate information in its request for an Estimate. The Contractor will not be liable for any loss or delays resulting from inaccurate or incomplete information provided by the Customer.
2.2. In the event of delays caused by the Customer, the Contractor shall be entitled to recovery, upon written demand, of all costs and expenses incurred as a consequence of the delay. The Contractor reserves the right to withhold, suspend, cancel or otherwise delay the job without financial penalty until payment of the costs, in full, in cleared funds has been received by the Contractor.
2.3. It is the Customer's responsibility to ensure the Estimate meets its requirements. The Contractor accepts no liability whatsoever for loss or delay arising as a result of the scope of works as detailed in the Estimate not meeting the Customer's requirements.
2.4. The Customer shall obtain any necessary consents to cross land or property not belonging to the Customer (other than public highways). The Contractor will on request provide without charge an acceptable standard form of consent and in carrying out the Works shall be entitled to rely upon the Customer's confirmation that such consents have been obtained.
2.5. The Customer shall provide free and uninterrupted access and egress to the Site and any third party property for the duration of the Works
2.6. The Customer is to provide lines and levels of the footways and carriageway on the Premises as required to facilitate the laying of the service pipe(s) or cable(s) or ducting or utility main(s). The Customer is responsible for all setting out of the Works. Should the required depths for utilities not be obtained then the Customer will be responsible for all costs and delays associated with the remedial works. The Contractor accepts no liability whatsoever for incorrect levels or setting out.
2.7. The Customer is responsible for all costs and supplementary charges associated with the Works.
2.8. Unless notified to the contrary it is deemed that:
2.8.1. The route of the Works will not cross any third party land (other than a public highway)
2.8.2. The premises do not form part of a multi-storey property
2.8.3. The Works are to be completed in no more than one visit, unless otherwise stated in the Estimate. In order to prevent abortive visits the Customer will ensure the site is ready.
2.8.4. All wayleave, easement agreements and consents are to be arranged by the Customer and be in place prior to commencement of the Works
2.8.5. Where the Works involve the alteration of any existing service pipe(s) or cable(s) or ducting or utility main(s), the customer will be responsible for any alterations/diversions required.
2.9. In the event that the Works are not as described either in the Estimate or in accordance with these Terms and Conditions then the Contractor shall be entitled to terminate the Agreement immediately and will refund to the Customer any part of the payment which has not been expended by the Contractor in relation to the Works at the time of termination.
2.10. The Price in the Estimate, unless otherwise specified, does not include any traffic management of barriers. Where traffic management is included the cost is dependant on the outcome of a final meeting with the appropriate Highways/Council Authorities regarding their Traffic Orders, Traffic Management Plans, Temporary Road Closures, Footpath Closures or Parking Bay Suspensions which may incur additional costs. If a Temporary Road Closure is required the average period for a Local Authority to process the Temporary Closure Order can be up to 12 weeks.
2.11. The new Traffic Management Act includes a provision, which allows local authorities to implement a permit scheme in their areas and a number of these schemes are currently progressing through the relevant legal processes towards implementation. In effect this means that rather than the Contractor notifying local authorities when they intend to excavate in the public highway, the connection provider will be required to ask for a permit to excavate in the highway. Associated with these new permit schemes will be additional charges from the local authorities to progress and grant permits. Until these schemes have been approved the Contractor will not know what these additional charges are. Any request by the Customer to halt or take over works in public shall render them responsible for all local authority charges and penalties should the works not be completed within the permitted timescales of the street works licence or permit. This Agreement does not include any costs for a permit scheme, should a permit scheme be introduced by the local authority in this area then the Contractor reserves the right to request payment of the permit charges prior to undertaking any works within the public highway. Control of these schemes does not sit with the Contractor and the Contractor can only include these charges once they have been finalised and the permit schemes are approved.
2.12. The Contractor will not be responsible for any issues or delays caused by third parties in respect of permit dates, parking bay suspensions or associated traffic management issues. All costs associated with additional traffic management or delays will be borne by the Customer
2.13. The Customer is responsible for ensuring the Site is suitable for all weather and any equipment required to perform the Works and for controlling the management of traffic at the Site to avoid unnecessary disruption or delays.
3. Specific Items
3.1.1. The following are not included in the Works unless the Estimate expressly states otherwise:-
(a) Excessive de-watering. Any de-watering will be deemed as additional costs.
(b) Estimate is based on good dry ground conditions only and free from any obstructions. Any delays or additional costs associated with adverse ground conditions due to weather will be the responsibility of the Customer
(c) Should any services stop the delivery of the Works additional costs will apply.
(d) Road cleaning
(e) Any change in scope of works due to unforeseen circumstances will be deemed as additional costs.
4. General
4.1.1. The Contractor reserves the right to amend the Price should any unforeseen engineering difficulties arise.
4.1.2. If no one is on site to accept and sign for receipt of goods, our suppliers will leave the materials (including ducting) on site. This will qualify as delivery and the Contractor reserves the right to charge the Customer for any replacement order of materials lost, damaged or stolen. Responsibility for all materials passes to the Customer upon delivery
4.1.3. The Contractor reserves right to charge for any abortive visits to site. The Customer acknowledges that any standing time will be charged at £1500 per day. The Customer further acknowledges that, unless provided with at least 10 working days cleared notice, abortive visits will be charged at £1500 per day.
4.1.4. The Estimate does not include any additional costs associated with Premium Rate Working (out of hours or weekend) associated with the provision of the Works. In the event that Premium Rate Working is required, the Contractor reserves the right to amend the Price and the Estimate to reflect any redesign.
4.1.5. All Estimates assume that the Customer will provide a secure area for storage on site along with welfare facilities. Responsibility of all cable, plant and apparatus with respect to theft and damage will transfer to the customer on installation or on being stored on Site. Should site storage and appropriate welfare facilities not be provided by the Customer, the Contractor will be entitled to additional costs and delay
4.1.6. Where any changes to The Works are required, the Contractor shall notify the customer of any additional costs, work will continue upon acceptance and payment of variation to contract but the Contractor accepts no liability for costs or delays resulting in a failure to agree the additional costs/scope of works.
4.1.7. The Estimate is based on material and labour costs prevailing at the time of the Estimate. The Contractor shall have the right to vary the Price in accordance with any variations in the material or labour costs subsequent to the date of the Estimate upon submitting written details of the additional cost to the Customer.
5. Excavation
5.1.1. Unless otherwise specified, the Estimate assumes standard ground conditions and therefore excludes the cost of excavations in rock, breaking up large concrete, excessive dewatering or brick obstructions or disposal of contaminated materials. Costs do not take into account or include for unidentified specialist works e.g. bridge crossings. Where any of this conditions outlined in 5.1.1 apply then the Contractor will be entitled to additional costs
5.1.2. We have not included for any specialist works pertaining to any environmental issues, including but not limited to wildlife projection and contaminated ground.
5.1.3. The Customer will provide the Contractor with all the facilities reasonably necessary to enable it to complete the Works in the most economical manner. Including the coordination of the Works with other contractors and on site personnel to ensure no unnecessary delays or additional costs are incurred by the Contractor.
5.1.4. Where a "Joint Bay" is included within our costs, unless otherwise specified, we have allowed for 2m x 2m of excavation to a maximum depth of 1m. Any additional excavation will be chargeable to the Customer
5.1.5. The Estimate is based on the Contractor working as a sub-contractor to the principle contractors with respect to CDM arrangements.
5.1.6. Our Estimate has no allowance for obtaining utility plans and it is assumed that the Customer will provide these details. Should the Contractor be required to obtain the utility plans a variation will be charged to the Customer.
5.1.7. Our Estimate is based on the meterage requested by the Customer. Should any further excavation / reinstatement works be required then the Contractor reserves the right to charge a variation to the Customer which will be payable upon demand.
5.1.8. No removal of shrubs, bushes or trees has been allowed for within the Estimate
5.1.9. The Estimate, unless otherwise specified, is based on desktop design and any excavation has been assumed as described in the Estimate. Should the route not be possible, or ground conditions are different to those quoted, upon attending Site, the Contractor reserves the charge additional costs and will be entitled to any associated extension of time
5.1.10. We have assumed that all waste will be inert waste. Inert wastes means noncombustible, nondanger- oussolid wastes that are likely to retain their physical and chemical structure under expected conditions of disposal, including resistance to biological attack and chemical attack from acidic rainwater. Should non-contaminated or contaminated waste require disposal then any additional cost will be the responsibility of the Customer
5.1.11. Unless otherwise specified, the Price is based on a 1.5 tonne excavator and 3 tonne dumper. Should bigger/additional machinery be required to complete the Works then all additional costs shall be the responsibility of the Customer
5.1.12. Unless otherwise specified in the Estimate, any carriageway excavation is assumed to be type 4 roadway with no reinforcement. Any additional costs shall be passed onto the client and become payable upon demand
5.1.13. Unless otherwise specified in the Estimate, any footpath excavation is assumed to require standard footway slab reinstatement with no specialist slab or reinstatement requirements. Any additional costs shall be passed onto the client and become payable upon demand
5.2. No Warranty
5.3. The Contractor makes no warranty expressed or implied, that the Estimate is suitable, and we do not accept responsibility for: -
5.3.1. The failure of surface water to disperse.
5.3.2. Any Subsidence.
5.3.3. Any damage that may occur due to causes over which we have no control.
5.3.4. Any damage caused by our plant above or below ground unless due to the proven negligence of our operatives.
5.4. Asbestos
5.4.1. The Price assumes that the site, including excavations, is free from asbestos. If asbestos is encountered, The Contractor will cease work immediately, until such time as suitable safe systems of work are in place, which ensures the safety of the Contractor's operatives and the general public. All associated costs, including delays, will be the Customer's responsibility.
6. Payment
6.1. Payment is due in line with the Payment Terms which accompany the Estimate
6.2. VAT is quoted at the current rate. Should there be a change in the rate applicable before payment is made the Customer will be liable for VAT at the new rate.
6.3. In the event that additional work is necessary to complete the Works ("Additional Work") either due to
6.3.1. an event which is not reasonably foreseeable
6.3.2. specifically noted exclusions within the Estimate and this Agreement
6.3.3. the Customer altering the requirements that it originally set out in its request for aan Estimate
6.3.4. A change of route required owing to issues outside of its reasonable control.
6.3.5. incorrect or incomplete information provided by the Customer
then the Contractor shall be entitled to make additional charges ("Additional Charges") to the Customer in respect of the Additional Work. The Contractor shall explain to the Customer the purpose and content of the Additional Works. The Additional Charges shall be agreed with the Customer in advance of the Additional Work being carried out. Payment for the Additional Charges must be made, in full, in cleared funds, prior to works being carried out. In the event that the Customer fails to agree to the Additional Charges, the Contractor shall not be obliged to carry out the Additional Work, nor complete the Works, and the Customer shall be deemed to have terminated the Contract and the provisions of clause 7 below shall apply.
6.3.7 The Contractor may at any time, without notice to the Customer, set off any liability of the Customer to the Contractor against any liability of Contractor to the Customer, whether either liability is present or future, liquidated or unliquidated, and whether or not either liability arises under this agreement. If the liabilities to be set off are expressed in different currencies, the Contractor may convert either liability at a market rate of exchange for the purpose of set-off. Any exercise by the Contractor of its rights under this clause shall not limit or affect any other rights or remedies available to it under this agreement or otherwise.
6.3.8 Where the customer has outstanding liabilities to the Contractor, whether financial or otherwise, the Contractor reserves the right to suspend, cancel or otherwise delay works in respect of any of their other liabilities or obligations to the Customer.
6.3.9 The Contractor reserves the right to charge a reasonable margin, not less than 15%, on all materials, labour and subcontractor costs incurred by the Contractor in association with the Works. This margin shall be applied to all variations and additional charges levied by the Contractor to the Customer
6.3.10 In the event the project is not complete within 365 days of the acceptance then the Contractor reserves the right to apply an increase to the Price of Works in line with the Retail Price Index (RPI). This will fall immediately due on the expiry of 365 from the date of the signed acceptance and must be paid by the Customer ahead of works continuing. The Contractor will not be liable for any delays or issues resulting from non-payment of the additional costs in line with the RPI.
7. Termination
7.1. The Customer may terminate this Agreement at any time by giving at least 10 full working days' notice but must pay to the Contractor the greater of:
- all costs (including VAT when applicable and the Contractor's margin of 30%) which, in the opinion of the Contractor, were reasonably incurred directly or in connection with the works as well as all costs reasonably foreseeably up to or as a result of the Customer's termination.
- 10% of the Price of the Works
7.2. The Contractor may terminate the Agreement;
7.2.1. Immediately if the information given by the Customer is incorrect and significantly affects the Estimate. The Contractor will refund to the Customer any part of the payment made which has not been expended or committed in relation to the Works at the time of termination.
7.2.2. By giving 5 working days written notice if the works are not completed within 120 calendar days from the date of the Estimate where the delay is not due to the fault or default of the Contractor. Where the Contractor terminates under this clause it will refund any part of the payment made which was not reasonably incurred at the time of termination.
7.2.3. At any time and for any other reason.
8. Use of Contractors
7.1 The Contractor is entitled to sub-contract the whole or any part of the Works.
7.2 The Customer shall not, without the prior written consent of the Contractor, at any time from the date of this agreement to the expiry of 12 months after the last date of supply of the Services, solicit or entice away from the Contractor or employ or attempt to employ any person who is, or has been, engaged as an employee, consultant or subcontractor of the Contractor in the provision of the Services.
7.3 Any consent given by the Contractor in accordance with clause 7.2 shall be subject to the Customer paying to the Contractor, on demand, without any set off or deduction, a sum equivalent to 100% of the then current annual remuneration of the Contractor's employee, consultant or subcontractor or, if higher, 100% of the annual remuneration to be paid by the Customer to that employee, consultant or subcontractor.
9. Conflict, Notices and Jurisdiction
9.1. In the event of any conflict or ambiguity between the Estimate and these Terms and Conditions, these Terms and Conditions shall take precedence.
9.2. In the event that the Contractor agrees to accept an order for the Works and in the event of any conflict or ambiguity between the Customer's order and these Terms and Conditions, these Terms and Conditions shall take precedence.
9.3. Any notice must be served by prepaid post or fax at the relevant Contractor or Customer address shown on the Estimate
9.4. The Agreement is governed by the laws of England and subject to the exclusive jurisdiction of the English Courts.
9.5. This Agreement sets out the entire agreement between the parties in relation to its subject matter and supersedes any previous correspondence and anything previously said, done, agreed or implied which adds or conflicts with it.
9.6. Each party acknowledges that in entering into this Agreement, it does not rely upon and shall no remedies in respect of any representations, correspondence or statements (whether made innocently or negligently) that is not set out in the Terms and Conditions or Estimate. The Contractor accepts no liability for innocent or negligent misrepresentation or negligent misstatement based on any terms in the Agreement.
9.7. The Terms and Conditions of this Agreement by their nature or context are intended to have effect after termination of this Agreement.
9.8. None of the provisions of this Agreement shall be considered waived by a party unless such waiver is given in writing and signed by a duly authorised representative of the party making the waiver. No such waiver shall be a waiver of any past or future default, breach or modification of any other provision unless expressly set out in such waiver.
9.9. Each and every clause or any part thereof appearing herein is a separate and severable provision and any found to be void, illegal or unenforceable shall be deemed deleted and the remaining provisions shall continue in full force and effect
10. Intellectual Property Rights
10.1.1. All Intellectual Property Rights in or arising out of or in connection with the Works (other than Intellectual Property Rights in any materials provided by the Customer) shall be owned by the Contractor.
10.1.2. The Contractor grants to the Customer or shall procure the direct grant to the Customer of, a fully paid-up, worldwide, non-exclusive, royalty-free licence during the term of the Contract for the purpose of receiving and using the Works in its business.
10.1.3. The Customer shall not sub-license, assign or otherwise transfer the rights granted in Clause 12.1.2.
10.1.4. The Customer grants the Contractor a fully paid-up, non-exclusive, royalty-free, non-transferable licence to copy and modify any materials provided by the Customer to the Contractor for the purpose of providing the Works to the Customer.
11. Limitation of Liability
11.1.1. Nothing in the Agreement shall limit or exclude the Contractor's liability for: death or personal injury caused by its negligence, or the negligence of its employees, agents or subcontractors; fraud or fraudulent misrepresentation; or breach of the terms implied by section 2 of the Supply of Goods and Services Act 1982 (title and quiet possession) or any other liability which cannot be limited or excluded by applicable law.
11.1.2. Subject to clause 13.1.1, the Contractor shall not be liable to the Customer, whether in contract, tort (including negligence), for breach of statutory duty, or otherwise, arising under or in connection with the Contract for: loss of profits; loss of sales or business; loss of agreements or contracts; loss of anticipated savings; loss of use or corruption of software, data or information; loss of damage to goodwill; and any indirect or consequential loss.
11.1.3. Subject to Clause 13.1.1, the Contractor's total liability to the Customer, whether in contract, tort (including negligence), breach of statutory duty, or otherwise, arising under or in connection with the Contract shall be limited to 1% of the original Price.
11.1.4. The terms implied by sections 3 to 5 of the Supply of Goods and Services Act 1982 are, to the fullest extent permitted by law, excluded from the Agreement.
11.1.5. The Customer agrees not to bring You agree not to bring any claim in respect of loss or damage suffered by the Customer or any third party whatsoever arising out of or in connection with this Agreement (including but not limited to delay or non-performance of our Works) against any of our directors, partners, employees or agents even where our directors, partners, employees or agents have been negligent. This restriction will not operate to exclude any liability that cannot be excluded at law. It is agreed that our directors, partners, employees and agents will have the right to enforce this paragraph pursuant to the Contracts (Rights of Third Parties) Act 1999. We reserve any right we may have to rescind or vary the Terms without having to seek the consent of our partners, employees or agents.
11.1.6. This clause 11 shall survive termination of the Agreement.
12. Customer Obligations
12.1. The Customer agrees to indemnify the Contractor for:
(a) any claims from owners or occupiers of other sites or premises for losses, damages, costs and expenses which arise as a necessary and unavoidable (using reasonable skill and care) consequence of the Contractor providing the Works
(b) any claim from any third party or other liability incurred by the Contractor as a result of the Customer failure to comply with their obligations under this Agreement.
12.2 Each clause in this clause 12 applies separately. If a court or authority tells us that the Contractor cannot enforce a certain clause, the other clauses will still apply.
13. COVID-19 and Associated Costs and Delays
13.1. The Contractor shall not be in breach of the Agreement or liable for any additional costs or delays in performing, or failure to perform, any of its obligations under or in connection with the Agreement if such delay or failure results from events, circumstances or causes related to or in connection with the COVID-19 pandemic or any other associated variants. The Contractor will be entitled to any reasonable uplift in costs associated with supply chain shortages, material price increases or labour costs.
Schedule 1
The following are not included in the Works unless the Estimate expressly states otherwise:-
a) The matching of any permanent reinstatement of drives, paths and other surfaces to the existing surface, colour or materials
b) The removal of any plants, trees or above ground obstructions
c) When a specialist surface (e.g a mosaic, coloured tarmac, tiles etc.) is encountered the Contractor will as part of the Works reinstate the excavated land with black tarmac or re-laid slabs or bricks (without any damaged slabs or bricks being replaced by new ones)
d) When carrying out works in a Customer's garden we request that the Customer re-locates plants that may be close to the working area to avoid damage. The Contractor will at all times take due care but will not be held responsible for any damage
e) The reinstatement of fences, walls, landscaping, drainage or special surface finishes of any kind
f) The making good of plasterwork, cosmetic surfaces, decorative finishes and the like other than damage caused by negligent or defective workmanship of the Contractor which shall be made good by the Contractor at no additional cost to the Customer
g) Working in or around contaminated ground
h) Trench excavations >2m in depth
i) Trial holes
j) Large or unidentified obstructions encountered including reinforced concrete or rock
k) Any phasing of the Works unless agreed
l) Any works outside those contained within the Estimate
m) Half width & full width carriageway reinstatement or any Section 58 obligations whatsoever
n) Cancelled works by third parties
o) Any alteration to the existing Network's pipework(or) or cable(s) or ducting or utility mains unless otherwise stated in the estimate
p) Any possible diversion of any utility apparatus
q) Any temporary works design, unless otherwise included in the Estimate. Should any design not be standard due to poor ground conditions additional costs will apply
r) The provision of air monitoring
s) The provision of temporary propping, hoarding, silt control of scaffolding